| « |  | » | 
| Down the neck of the smelter -- notice the line at 10 o'clock from the edge of the metal. Our supply of refractory cement was not enough to build the full height so a double layer of cobb was used at the top of the smelter. Previous  Report  Next Text © Neil Peterson, 2017 Photographs © Neil Peterson, 2017 Copyright details Contact us | ||